Huntingdon Trail stormwater project is in concept design and easement planning
The September report targets November 2026 for the end of engineering design services, not construction completion.
In this report: reported
Topics / Metro Atlanta
Water, sewer, energy and the capacity supporting communities.
The September report targets November 2026 for the end of engineering design services, not construction completion.
In this report: reported
The September capital-project report listed an Oct. 2 proposal deadline. The retained entry does not establish a contract award.
In this report: reported
Two-way traffic was operating on both roads. The September report says Roswell Road signals remained in a temporary configuration pending overhead utility relocation.
In this report: reported
The Veolia request covered a maximum 183-day extension from April 1 through September 30, 2026.
In this report: proposed
The proposed Fulton–GDOT agreement covers the Johns Creek corridor from Promise Parkway to Boles Road.
In this report: proposed
Site Engineering and Wade Coots Company would each receive a spending ceiling of $1.5 million for April–December 2026 services.
In this report: proposed
The requests covered a 17,008-square-foot sewer easement and a separate 17,496-square-foot water easement for the Alpharetta project.
In this report: proposed
Arkan Bethany would dedicate an 11,674.08-square-foot water easement and a separate 14,026-square-foot sewer easement to Fulton County.
In this report: proposed
Two agreements at 5555 Windward Parkway address separate county sanitary-sewer and water-line easements.
In this report: proposed
The requested agreement with Toll Southeast LP Company concerns the sanitary sewer system at 1000 Lexington Farm Drive in Alpharetta.
In this report: proposed
The authorization covers six agreements from Oct. 15 through Feb. 14, 2027. Adoption does not establish executed contract amendments.
In this report: approved
The recommended substitute carries a $27.22 million additional-funding ceiling. A prior 90-day extension moved the agreements’ expiration to Oct. 14.
In this report: recommended
Water and sewer repairs exhausted existing paving funds, the resolution says. The amendment would raise the contract ceiling to $15.61 million.
In this report: approved
The held plan would require transition plans within 180 days and condition new water connections on compliant cooling, while preserving existing contracts.
In this report: deferred
Customers would need to document a city recording error, including a no-leak inspection within 30 days of the bill’s payment due date.
In this report: deferred
The work would serve businesses in Milton, Alpharetta, Johns Creek and part of Roswell.
In this report: proposed
The proposed Fulton–GDOT agreement concerns the corridor from Roosevelt Highway to Buffington Road, with an estimated $33,000 in associated work.
In this report: proposed
The proposed dedication would convey sewer-related land rights to Fulton County for the project at 93 Canton Street.
In this report: proposed
Fulton County would receive sewer-related land rights to support construction at 93 Canton Street in Alpharetta.
In this report: proposed
The proposed agreement concerns conditional permission at 1580 Mayfield Road in Alpharetta, not authorization to install new infrastructure.
In this report: proposed
Topics describe each report’s subject, not its approval status. Older articles may not have topic tags. Browse all articles →