Metro Atlanta News

CitiesExplore

Local brief

Frisco’s vacation-rental cap rewrite would leave pre-2026 housing restrictions alone

Staff says The Scout and Bella would no longer add 27 license slots. A first reading is scheduled for October 27.

Current coverage updates this story. 27 potential vacation-rental slots are at stake in Frisco’s next cap vote →

Frisco, Colorado, would stop newly deed-restricted workforce homes from expanding its vacation-rental license cap—but would leave homes with restrictions recorded before 2026 in the calculation. That is the boundary staff drew after the Town Council’s October 13 work session.⁠[1]

As we reported before the October 13 work session, the connection is mathematical: Frisco caps short-term-rental licenses at 25% of its residential housing inventory, which includes deed-restricted homes. Building protected housing can therefore create room for vacation-rental licenses elsewhere—not turn the protected apartments themselves into vacation rentals. The October report lists 924 licenses, up from the original 900.⁠[1]

The stakes are concrete. Staff projects that The Scout’s 54 deed-restricted apartments would add 14 license slots in 2027 under unchanged rules, while Bella’s 52 would add another 13 in 2028. Under the proposed ordinance, neither project would increase the cap.⁠[1]

Staff describes the first affected calculation as the 2027 annual certification, using deed restrictions first recorded during 2026. Newly built homes with qualifying income or local-employment restrictions would not be added to the inventory; existing unrestricted homes receiving new restrictions would be deducted. Homes whose restrictions were recorded on or before December 31, 2025, would stay in the base.⁠[1]

That grandfathered base reflects a choice about the waiting list. Several council members worried that retroactively subtracting restricted homes could substantially lengthen existing applicants’ waits, according to staff. The report counted 62 waiting properties as of September 24, with the first in line waiting since January 12.⁠[1]

An email from Alex Beach included in the packet argues for a broader reduction: exclude all deed-restricted homes and let license numbers fall through turnover rather than revoke existing licenses. But Beach also proposed protecting people already waiting—keep the current license count until those applicants receive licenses, then lower it for future applicants. That transition is part of his alternative, not the staff proposal.⁠[1]

There is a wording distinction to watch at first reading. The staff report expressly describes a 2027 certification and a cutoff based on when restrictions were first recorded. The draft ordinance instead says “beginning January 1, 2026” in its annual-count provision, without spelling out that recording-date cutoff in the same terms.⁠[1]

Reported as of October 26, 2026: Ordinance 26-14 is a proposal, not an adopted code change. Its first reading is scheduled for October 27. Staff recommends approval and lists a second reading for November 10.⁠[1]

Sources

1 official source cited in this report. The bracketed numbers in the text link here.

Open the official record ↗

More from Frisco

More in Frisco →All stories →